Bathroom Remodel |
|---|
Ed's clients hated their mid-1980's master bathroom. It was a decent size, but it was chopped up, with most of of the space lavished on the Jacuzzi. The shower, used several times a day, was phone booth sized, and the toilet was cramped. They asked Ed to "open up" the space and give them a roomier shower. Ed helped them design the new layout, and then built it for them. Click the photo below to get a higher-resolution view (click it a second time after it has opened in a new window). |